Stage Two of the project included an independent investigation for the continuation of the new shared path towards Mount Alexander Road. The investigation explored three alignment options east of the sound walls, with the preferred route extending approximately 500 metres and reconnecting to the existing shared path to the south of the Alt Tower.
Notwithstanding, the investigation found that all options while feasible presented a number of significant issues. Most notably the preferred option would require the removal of over 100 trees of various maturity. This does not align with Council’s MV2040 Strategy to protect and increase tree canopy cover and vegetation diversity in reserves and on private land. Another major issue is that a shared path running in close proximity to the Moonee Ponds Creek channel (where the embankment is shallower) would present a significant flooding risk and may not meet flooding requirements. Given the limited time travel time benefits, likely substantial construction costs and the need to prioritise other sections of the shared path to upgrade to meet safety requirements, Council will not be pursuing the extension of the shared path.
We are committed to upgrading our shared paths to the highest possible standard and will continue to develop a number of projects that will improve safety and accessibility for all shared path users.