What you need to know

Standard Drawings

For further information, please contact Engineering Services onĀ 9243 8888.

Anything constructed in our road reserve must be constructed following the approved Standard Drawing. (All files are PDF)

Drawing NumberĀ  Drawing Description Amendment dateĀ 
Standard Drawing index & set See Title Page
Ā MV 1 Grated Pit in road Channel - Construction Details June 2023
Ā MV 2 Concrete Kerb & Channel June 2023
Ā MV 3 Semi-Mountable Concrete Kerbs June 2023
Ā MV 4 Mountable Concrete Kerbs June 2023
Ā MV 5 Bluestone Kerb & Channel June 2025
Ā MV 5A Miscellaneous Bluestone Kerb Details June 2025
Ā MV 6 Bluestone Kerb & Channel June 2025
Ā MV 7 Concrete Residential Vehicular Crossing June 2025
Ā MV 7A Special Concrete Residential Vehicle Crossing April 2022
Ā MV 7B Special Bluestone Residential Vehicle Crossing April 2022
Ā MV 7C Concrete Residential Vehicle Crossing - Reverse Fall April 2022
Ā MV 8 Concrete Commercial Vehicular Crossing June 2025
Ā MV 9 Standard Concrete Layback Kerb June 2025
Ā MV 10 Bluestone Splitter Island June 2025
Ā MV 11 Concrete Splitter Island - Type A June 2025
Ā MV 12 Concrete Splitter Island - Type B June 2025
Ā MV 13 Grated Side Entry Pit (Barrier Kerb) June 2025
Ā MV 13A Double Grated Side Entry Pit (Barrier Kerb) June 2025
Ā MV 13B Haunched Double Grated Side Entry Pit June 2023
Ā MV 14 Concrete Kerb Reinstatement Detail June 2025
Ā MV 20 Pram Crossing Detail April 2022
Ā MV 21 Pram Crossing Typical Arrangement April 2022
Ā MV 22 Tactile Ground Surface Indicators Sept 2025
Ā MV 23 Traffic Island Detail June 2025
Ā MV 24 Lawn Reinstatement Detail June 2025
Ā MV 25A-1 Asphalt Watts Profile Road Hump - Layout June 2023
Ā MV 25A-2 Asphalt Watts Profile Road Hump - Details June 2023
Ā MV 25B-1 Asphalt Flat Top Road Hump June 2023
Ā MV 25B-2 Bus Friendly Flat Top Road Hump June 2023
Ā MV 25C Asphalt Speed Cushion June 2023
Ā MV 26 Stormwater Drainage Trench & Backfill Details June 2025
Ā MV 26A Authority Services Trench & Backfill Details June 2025
Ā MV 27A Stormwater Drain Connections to Kerb & Channel April 2022
Ā MV 27B Stormwater Drain Connections to Underground Drain April 2022
Ā MV 29 Side Entry Pit - Construction Details June 2023
Ā MV 29A Side Entry Pit (SM2 Kerb) - Construction Details June 2023
Ā MV 30 Junction Pit Construction Details June 2023
Ā MV 30A Grated Junction Pit & Surround - Construction Details June 2025
Ā MV 31 Side Entry Pit with Grate - Construction Details June 2025
Ā MV 31A Large Side Entry Pit with Grate - Construction Details June 2025
Ā MV 32 Haunched Pits - Construction Details June 2023
Ā MV 34 Reinforced Concrete Pavement for ROWs April 2022
Ā MV 35 Agricultural Drain Details June 2025
Ā MV 36 Concrete Shared Path Detail April 2022
Ā MV 37 Pipeline Anchor Block June 2025
Ā MV 38 Brick Band & Paving Detail June 2025
Ā MV 39 Details of Various Footpaths April 2022
Ā MV 41 Agricultural Drainage Pipes June 2025
Ā MV 42A Typical Stormwater Connection & Reinstatement Details June 2025
Ā MV 42B Typical Stormwater Connection & Reinstatement Details June 2025
Ā MV 43 Asphalt Right of Way - Typical Sections June 2023
Ā MV 44A Bike Safe Fence - Covr Page & General Notes June 2024
Ā MV 44B Bike Safe Fence - Pedestrian Fence June 2024
Ā MV 44C Bike Safe Fence - Handrail Footings, Footings & Slab Details, Pier Footing Details June 2024
Ā MV 45 Typical Bike Rail Arrangement May 2023