What you need to know

Standard Drawings

For further information, please contact Engineering Services on 9243 8888.

Anything constructed in our road reserve must be constructed following the approved Standard Drawing. (All files are PDF)

Drawing Number  Drawing Description Amendment date 
Standard Drawing index & set See Title Page
 MV 1 Grated Pit in road Channel - Construction Details June 2023
 MV 2 Concrete Kerb & Channel June 2023
 MV 3 Semi-Mountable Concrete Kerbs June 2023
 MV 4 Mountable Concrete Kerbs June 2023
 MV 5 Bluestone Kerb & Channel June 2025
 MV 5A Miscellaneous Bluestone Kerb Details June 2025
 MV 6 Bluestone Kerb & Channel June 2025
 MV 7 Concrete Residential Vehicular Crossing June 2025
 MV 7A Special Concrete Residential Vehicle Crossing April 2022
 MV 7B Special Bluestone Residential Vehicle Crossing April 2022
 MV 7C Concrete Residential Vehicle Crossing - Reverse Fall April 2022
 MV 8 Concrete Commercial Vehicular Crossing June 2025
 MV 9 Standard Concrete Layback Kerb June 2025
 MV 10 Bluestone Splitter Island June 2025
 MV 11 Concrete Splitter Island - Type A June 2025
 MV 12 Concrete Splitter Island - Type B June 2025
 MV 13 Grated Side Entry Pit (Barrier Kerb) June 2025
 MV 13A Double Grated Side Entry Pit (Barrier Kerb) June 2025
 MV 13B Haunched Double Grated Side Entry Pit June 2023
 MV 14 Concrete Kerb Reinstatement Detail June 2025
 MV 20 Pram Crossing Detail April 2022
 MV 21 Pram Crossing Typical Arrangement April 2022
 MV 23 Traffic Island Detail June 2025
 MV 24 Lawn Reinstatement Detail June 2025
 MV 25A-1 Asphalt Watts Profile Road Hump - Layout June 2023
 MV 25A-2 Asphalt Watts Profile Road Hump - Details June 2023
 MV 25B-1 Asphalt Flat Top Road Hump June 2023
 MV 25B-2 Bus Friendly Flat Top Road Hump June 2023
 MV 25C Asphalt Speed Cushion June 2023
 MV 26 Stormwater Drainage Trench & Backfill Details June 2025
 MV 26A Authority Services Trench & Backfill Details June 2025
 MV 27A Stormwater Drain Connections to Kerb & Channel April 2022
 MV 27B Stormwater Drain Connections to Underground Drain April 2022
 MV 29 Side Entry Pit - Construction Details June 2023
 MV 29A Side Entry Pit (SM2 Kerb) - Construction Details June 2023
 MV 30 Junction Pit Construction Details June 2023
 MV 30A Grated Junction Pit & Surround - Construction Details June 2025
 MV 31 Side Entry Pit with Grate - Construction Details June 2025
 MV 31A Large Side Entry Pit with Grate - Construction Details June 2025
 MV 32 Haunched Pits - Construction Details June 2023
 MV 34 Reinforced Concrete Pavement for ROWs April 2022
 MV 35 Agricultural Drain Details June 2025
 MV 36 Concrete Shared Path Detail April 2022
 MV 37 Pipeline Anchor Block June 2025
 MV 38 Brick Band & Paving Detail June 2025
 MV 39 Details of Various Footpaths April 2022
 MV 41 Agricultural Drainage Pipes June 2025
 MV 42A Typical Stormwater Connection & Reinstatement Details June 2025
 MV 42B Typical Stormwater Connection & Reinstatement Details June 2025
 MV 43 Asphalt Right of Way - Typical Sections June 2023
 MV 44A Bike Safe Fence - Covr Page & General Notes June 2024
 MV 44B Bike Safe Fence - Pedestrian Fence June 2024
 MV 44C Bike Safe Fence - Handrail Footings, Footings & Slab Details, Pier Footing Details June 2024
 MV 45 Typical Bike Rail Arrangement May 2023