Drawing Number |
Drawing Description |
Amendment date |
Standard Drawing index & set |
See Title Page |
MV 1 |
Grated Pit in road Channel - Construction Details |
June 2023 |
MV 2 |
Concrete Kerb & Channel |
June 2023 |
MV 3 |
Semi-Mountable Concrete Kerbs |
June 2023 |
MV 4 |
Mountable Concrete Kerbs |
June 2023 |
MV 5 |
Bluestone Kerb & Channel |
June 2025 |
MV 5A |
Miscellaneous Bluestone Kerb Details |
June 2025 |
MV 6 |
Bluestone Kerb & Channel |
June 2025 |
MV 7 |
Concrete Residential Vehicular Crossing |
June 2025 |
MV 7A |
Special Concrete Residential Vehicle Crossing |
April 2022 |
MV 7B |
Special Bluestone Residential Vehicle Crossing |
April 2022 |
MV 7C |
Concrete Residential Vehicle Crossing - Reverse Fall |
April 2022 |
MV 8 |
Concrete Commercial Vehicular Crossing |
June 2025 |
MV 9 |
Standard Concrete Layback Kerb |
June 2025 |
MV 10 |
Bluestone Splitter Island |
June 2025 |
MV 11 |
Concrete Splitter Island - Type A |
June 2025 |
MV 12 |
Concrete Splitter Island - Type B |
June 2025 |
MV 13 |
Grated Side Entry Pit (Barrier Kerb) |
June 2025 |
MV 13A |
Double Grated Side Entry Pit (Barrier Kerb) |
June 2025 |
MV 13B |
Haunched Double Grated Side Entry Pit |
June 2023 |
MV 14 |
Concrete Kerb Reinstatement Detail |
June 2025 |
MV 20 |
Pram Crossing Detail |
April 2022 |
MV 21 |
Pram Crossing Typical Arrangement |
April 2022 |
MV 23 |
Traffic Island Detail |
June 2025 |
MV 24 |
Lawn Reinstatement Detail |
June 2025 |
MV 25A-1 |
Asphalt Watts Profile Road Hump - Layout |
June 2023 |
MV 25A-2 |
Asphalt Watts Profile Road Hump - Details |
June 2023 |
MV 25B-1 |
Asphalt Flat Top Road Hump |
June 2023 |
MV 25B-2 |
Bus Friendly Flat Top Road Hump |
June 2023 |
MV 25C |
Asphalt Speed Cushion |
June 2023 |
MV 26 |
Stormwater Drainage Trench & Backfill Details |
June 2025 |
MV 26A |
Authority Services Trench & Backfill Details |
June 2025 |
MV 27A |
Stormwater Drain Connections to Kerb & Channel |
April 2022 |
MV 27B |
Stormwater Drain Connections to Underground Drain |
April 2022 |
MV 29 |
Side Entry Pit - Construction Details |
June 2023 |
MV 29A |
Side Entry Pit (SM2 Kerb) - Construction Details |
June 2023 |
MV 30 |
Junction Pit Construction Details |
June 2023 |
MV 30A |
Grated Junction Pit & Surround - Construction Details |
June 2025 |
MV 31 |
Side Entry Pit with Grate - Construction Details |
June 2025 |
MV 31A |
Large Side Entry Pit with Grate - Construction Details |
June 2025 |
MV 32 |
Haunched Pits - Construction Details |
June 2023 |
MV 34 |
Reinforced Concrete Pavement for ROWs |
April 2022 |
MV 35 |
Agricultural Drain Details |
June 2025 |
MV 36 |
Concrete Shared Path Detail |
April 2022 |
MV 37 |
Pipeline Anchor Block |
June 2025 |
MV 38 |
Brick Band & Paving Detail |
June 2025 |
MV 39 |
Details of Various Footpaths |
April 2022 |
MV 41 |
Agricultural Drainage Pipes |
June 2025 |
MV 42A |
Typical Stormwater Connection & Reinstatement Details |
June 2025 |
MV 42B |
Typical Stormwater Connection & Reinstatement Details |
June 2025 |
MV 43 |
Asphalt Right of Way - Typical Sections |
June 2023 |
MV 44A |
Bike Safe Fence - Covr Page & General Notes |
June 2024 |
MV 44B |
Bike Safe Fence - Pedestrian Fence |
June 2024 |
MV 44C |
Bike Safe Fence - Handrail Footings, Footings & Slab Details, Pier Footing Details |
June 2024 |
MV 45 |
Typical Bike Rail Arrangement |
May 2023 |