What you need to know

Standard Drawings

Please note that all Standard Drawings are under review. For further information, please contact Engineering Services on 9243 8888.

Anything constructed in our road reserve must be constructed following the approved Standard Drawing.

Drawing Number  Drawing Description Amendment date 
Standard Drawing index & set See Title Page
 MV 1 Grated Pit in road Channel - Construction Details June 2023
 MV 2 Concrete Kerb & channel June 2023
 MV 3 Semi-Mountable Concrete Kerb & Channel June 2023
 MV 4 Concrete Open Invert Channels June 2023
 MV 5 Bluestone Kerb & Channel April 2007
 MV 5A Fully Mountable Bluestone Kerb April 2007
 MV 6 Bluestone Kerb & Channel April 2007
 MV 7 Residential Concrete Vehicular Crossing April 2022
 MV 7A Special Concrete Residential Concrete Vehicular Crossing April 2022
 MV 7B Special Bluestone Residential Concrete Vehicular Crossing April 2022
 MV 7C Special Concrete Vehicular Crossing – Reverse Fall April 2022
 MV 8 Commercial Concrete Vehicular Crossing September 2006
 MV 9 Standard Concrete Layback Kerb September 2006
 MV 10 Bluestone Splitter Island April 2007
 MV 11 Concrete Splitter Island September 2006
 MV 12 Concrete Splitter Island Type B September 2006
 MV 13 Side Entry Pit (B Type Kerb) April 2007
 MV 13A Grated Double Side Entry Pit (B Type Kerb) April 2007
 MV 13B Haunched Grated Double Side Entry Pit (B Type Kerb) June 2023
 MV 13C Side Entry Pit (SM2 Type Kerb) April 2007
 MV 14 Concrete Kerb Reinstatement Detail September 2006
 MV 15 Not used
 MV 16 Not used
 MV 17 Not used
 MV 18 Not used
 MV 19 Not used
 MV 20 Pram Crossing Detail April 2022
 MV 21 Pram Crossing Typical Arrangement April 2022
 MV 22 Heavy Duty Pram Crossing Detail (Deleted) April 2022
 MV 23 Traffic Island Detail September 2006
 MV 24 Lawn Reinstatement Detail September 2006
 MV 25A-1 Standard Asphalt Watts Profile Road Hump June 2023
 MV 25A-2 Standard Asphalt Watts Profile Road Hump June 2023
 MV 25B-1 Standard Asphalt Flat Top Road Hump June 2023
 MV 25B-2 Standard Bus Friendly Asphalt Flat Top Road Hump June 2023
 MV 25C Speed Cushion June 2023
 MV 26 Pipe Laying and Backfill Construction Detail June 2023
 MV 27 (1 of 2) Stormwater Drain Connections April 2022
 MV 27 (2 of 2) Stormwater Drain Connections  April 2022
 MV 27 (3 of 3) Stormwater Drain Connections (Deleted) April 2022
 MV 28 House Drain Pipe Connections (Deleted) June 2023
 MV 29 Side Entry Pit - Construction Details June 2023
 MV 29A Side Entry Pit (SM2 Type Kerb) - Construction Details June 2023
 MV 30 Junction Pit Construction Details June 2023
 MV 30A Grated Junction Pit & Surround Construction Details April 2007
 MV 31 Side Entry Pit With Grate - Construction Details April 2007
 MV 31A Modified Grated Side Entry Pit - Construction Details September 2006
 MV 31B Modified Grated Side Entry Pit (SM2 Type Kerb) - Construction Details  March 2007
 MV 31C Side Entry Pit With Grate (SM2 Kerb) - construction Details April 2007
 MV 32  Haunched Junction Pit Details Up To 2.4m Depth June 2023
 MV 33 Grated Haunched Driveway Junction Pit - Construction Details (Deleted) June 2023
 MV 34 Standard Reinforced Concrete Pavement For Right Of Way's(R.O.W's) April 2022
 MV 35 Agricultural Drain Detail December 2005
 MV 36 Concrete Shared Path Detail April 2022
 MV 37 Anchor Block May 2006
 MV 38 Brick Band & Paving Detail October 2006
 MV 39 Details of Various Footpaths April 2022
 MV 40 Moonee Valley Electricity Pit Lid June 2007
 MV 41 Agricultural Drainage Pipes July 2007
 MV 42 Typical Reinstatement Works & Stormwater Connection Details July 2007
 MV 43 Asphalt Right Of Way (R.O.W) Typical Sections August 2007
 MV 44A-1 Pedestrian and Barrier Fence Details & Cover Page
(Sheet 1 of 2)
June 2023
 MV 44A-2 Pedestrian and Barrier Fence Details & General Notes
(Sheet 2 of 2)
June 2023
 MV 44B-1 Pedestrian Fence
(Sheet 1 of 4)
June 2023
 MV 44B-2 Pedestrian Fence with Handrail
(Sheet 2 of 4)
June 2023
 MV 44B-3 Pedestrian Fence with Diversion Rail
(Sheet 3 of 4)
June 2023
 MV 44B-4 Pedestrian Fence with Diversion Rail & Handrail
(Sheet 4 of 4)
June 2023
 MV 44C-1 Concrete Footings Slab - Plan View
(Sheet 1 of 2)
June 2023
 MV 44C-2 Concrete Footings Slab - Details View
(Sheet 2 of 2)
June 2023