| Drawing Number | Drawing Description | Amendment date | 
| Standard Drawing index & set | See Title Page | 
| MV 1 | Grated Pit in road Channel - Construction Details | June 2023 | 
| MV 2 | Concrete Kerb & Channel | June 2023 | 
| MV 3 | Semi-Mountable Concrete Kerbs | June 2023 | 
| MV 4 | Mountable Concrete Kerbs | June 2023 | 
| MV 5 | Bluestone Kerb & Channel | June 2025 | 
| MV 5A | Miscellaneous Bluestone Kerb Details | June 2025 | 
| MV 6 | Bluestone Kerb & Channel | June 2025 | 
| MV 7 | Concrete Residential Vehicular Crossing | June 2025 | 
| MV 7A | Special Concrete Residential Vehicle Crossing | April 2022 | 
| MV 7B | Special Bluestone Residential Vehicle Crossing | April 2022 | 
| MV 7C | Concrete Residential Vehicle Crossing - Reverse Fall | April 2022 | 
| MV 8 | Concrete Commercial Vehicular Crossing | June 2025 | 
| MV 9 | Standard Concrete Layback Kerb | June 2025 | 
| MV 10 | Bluestone Splitter Island | June 2025 | 
| MV 11 | Concrete Splitter Island - Type A | June 2025 | 
| MV 12 | Concrete Splitter Island - Type B | June 2025 | 
| MV 13 | Grated Side Entry Pit (Barrier Kerb) | June 2025 | 
| MV 13A | Double Grated Side Entry Pit (Barrier Kerb) | June 2025 | 
| MV 13B | Haunched Double Grated Side Entry Pit | June 2023 | 
| MV 14 | Concrete Kerb Reinstatement Detail | June 2025 | 
| MV 20 | Pram Crossing Detail | April 2022 | 
| MV 21 | Pram Crossing Typical Arrangement | April 2022 | 
| MV 22 | Tactile Ground Surface Indicators | Sept 2025 | 
| MV 23 | Traffic Island Detail | June 2025 | 
| MV 24 | Lawn Reinstatement Detail | June 2025 | 
| MV 25A-1 | Asphalt Watts Profile Road Hump - Layout | June 2023 | 
| MV 25A-2 | Asphalt Watts Profile Road Hump - Details | June 2023 | 
| MV 25B-1 | Asphalt Flat Top Road Hump | June 2023 | 
| MV 25B-2 | Bus Friendly Flat Top Road Hump | June 2023 | 
| MV 25C | Asphalt Speed Cushion | June 2023 | 
| MV 26 | Stormwater Drainage Trench & Backfill Details | June 2025 | 
| MV 26A | Authority Services Trench & Backfill Details | June 2025 | 
| MV 27A | Stormwater Drain Connections to Kerb & Channel | April 2022 | 
| MV 27B | Stormwater Drain Connections to Underground Drain | April 2022 | 
| MV 29 | Side Entry Pit - Construction Details | June 2023 | 
| MV 29A | Side Entry Pit (SM2 Kerb) - Construction Details | June 2023 | 
| MV 30 | Junction Pit Construction Details | June 2023 | 
| MV 30A | Grated Junction Pit & Surround - Construction Details | June 2025 | 
| MV 31 | Side Entry Pit with Grate - Construction Details | June 2025 | 
| MV 31A | Large Side Entry Pit with Grate - Construction Details | June 2025 | 
| MV 32 | Haunched Pits - Construction Details | June 2023 | 
| MV 34 | Reinforced Concrete Pavement for ROWs | April 2022 | 
| MV 35 | Agricultural Drain Details | June 2025 | 
| MV 36 | Concrete Shared Path Detail | April 2022 | 
| MV 37 | Pipeline Anchor Block | June 2025 | 
| MV 38 | Brick Band & Paving Detail | June 2025 | 
| MV 39 | Details of Various Footpaths | April 2022 | 
| MV 41 | Agricultural Drainage Pipes | June 2025 | 
| MV 42A | Typical Stormwater Connection & Reinstatement Details | June 2025 | 
| MV 42B | Typical Stormwater Connection & Reinstatement Details | June 2025 | 
| MV 43 | Asphalt Right of Way - Typical Sections | June 2023 | 
| MV 44A | Bike Safe Fence - Covr Page & General Notes | June 2024 | 
| MV 44B | Bike Safe Fence - Pedestrian Fence | June 2024 | 
| MV 44C | Bike Safe Fence - Handrail Footings, Footings & Slab Details, Pier Footing Details | June 2024 | 
| MV 45 | Typical Bike Rail Arrangement | May 2023 |